This page follows CABO Solana through factory construction and fit-out.
The images show the home taking shape across the bathroom, sleeping areas, kitchen, office, main living space, stairs, and exterior.
It also records the build and supplier decisions that later affected how the home fitted together, worked and felt in everyday use.
* Electrical and services preparation
What this stage showed
The finished result depended on a long list of smaller choices made while the home was still being built.
Room dimensions, wiring, plumbing, windows, storage, stairs, appliances, cabinetry, access, and exterior finishes all had to work together before CABO Solana ever reached the site.
Bath
Beds
Kitchen and Office
Main
Exterior
The lesson
The build stage is where later problems can either be prevented or quietly built in.
Choices that appear small on a plan can affect daily comfort, access, power use, storage, maintenance, and whether products actually fit once the home is complete.
Connected to FM DIRECT
What happened during the build helps shape how FM DIRECT approaches pre-build planning and fit-out.
Before choosing a layout or supplier, buyers need to think through their appliances, storage, access, services, living needs and future plans, because each one can affect the build.

Next stage
Once construction was finished, CABO Solana could be viewed as a completed home before delivery and placement.